from $396,955
locationpackages
from $396,955
FROM $396,955
locationview packages
ARBOR - ELLEN GROVE (FOREST LAKE)
COME HOME TO A FAMILY FRIENDLY
ADDRESS YOU WILL LOVE
Arbor at Ellen Grove will connect you with nature from the moment you arrive.

Take in a landscape of magnificent native trees with the leafy surrounds providing the perfect backdrop for serene living just eighteen kilometres from the CBD.

Arbor at Ellen Grove offers thoughtfully considered homesites for the most discerning residents with lifestyle options for all walks of life. Enjoy being so close to everything you need - just a stones throw from the reacreation and shopping hub of Forest Lake.
view packages
Arbor - Ellen Grove
Locality Map
for more information contact us on
(07) 5563 2155  seven days a week
call now
follow Unity Homes
Copyright Unity Homes - a division of Colonial Building Company  ABN 38 033 989 069
QBCC Act Licence 77948   |   NSW Licence 274250C . All rights reserved.

All images are for illustrative purposes only and may depict items that are not included in the home pricing and/or not offered by the Builder (Unity Homes). Additional design and/or alternate materials and/or colours may be required to meet Development specific Covenant requirements. Facade shown may be optional depending on level of Inclusion selected. Facade selection may alter Floor Plan layout.  Facade and/or Floor Plan may need to be mirror reversed from layout shown on flyer to meet Covenant, setback and/or build to boundary requirements.

All plans are the copyright of the Builder and no part of any plans can be used, distributed or reproduced by any means without the written permission of the Builder. All prices quoted were available at time of publication however are subject to availability. 

Some blocks offered for house + land packages are not exclusive to the Builder.

The Builder reserves the right to amend or withdraw prices at it's discretion.The Builder reserves the right to amend errors and/or omissions or alter and/or improve website contents.

~ Necessary site works does not include H2 or E sites. Additional costs will apply.